Texas and federal UST rules set the test schedule for gas stations and C-stores: line leak detectors and ATG / release-detection equipment every year, spill buckets and containment sumps every 3 years, cathodic protection every 3 years by a qualified corrosion specialist or technician, and line tightness yearly for pressurized piping where it is the chosen method or every 3 years for suction piping.
Find fire safety service providers in Houston, Texas and compare their bids. Ask providers to document work against the applicable 30 TAC Ch. 334 / 40 CFR Part 280 requirements.
Free to post · No commitment
FireMarket's free calendar tracks each test from its last date, reminds you before it is due, stores the results for 5 years and lets you request a Houston tank tester from the same record. Impressed-current rectifier checks every 60 days and Class A/B operator retraining every 3 years are kept as records.
Required frequency: Line leak detector: annual (30 TAC §334.50(b)(2)(A)(i)(III)). ATG operability: annual (40 CFR 280.40(a)(3)). Spill buckets and sumps: every 3 years (40 CFR 280.35(a)(1)(ii)). Cathodic protection: every 3 years (30 TAC §334.49(c)(4)(C)). Line tightness: annual pressurized / every 3 years suction (30 TAC §334.50(b)(2))
Cathodic protection must be tested by a qualified corrosion specialist or corrosion technician (30 TAC §334.49(c)(4)(A)). UST testing is not an SFMO/TDI fire-protection license class, so review each tester's credentials, insurance and service area on its profile before you hire. FireMarket does not file results with TCEQ for you.
Yes, under 40 CFR 280.35(a)(1)(ii), when the double-walled equipment's interstitial space is monitored at least every 30 days. Keep the monitoring records.
Keep ATG and release-detection operability test results for 5 years (40 CFR Part 280). Texas requires cathodic protection test results to be kept at least 5 years (30 TAC §334.49(e)). FireMarket keeps uploaded UST records 5 years.
Cathodic protection must be tested by a qualified corrosion specialist or corrosion technician (30 TAC §334.49(c)(4)(A)). UST testing is not an SFMO/TDI fire-protection license class, so review each tester's credentials, insurance and service area on its profile before you hire. FireMarket does not file results with TCEQ for you.
FireMarket does not publish a fixed price for this service. Request a quote; price depends on system size and condition, site access, deficiencies found, parts, after-hours work, and the reports or tags required.
Yes. Ask the contractor to price inspection and testing separately from repair or replacement line items, so you can approve corrective work after seeing the findings.
Create a free owner account, post the job, compare bids, and hire on FireMarket. Bidding is capacity-aware, and time-on-site check-in and check-out can document the visit. Booking is not instant.
Add your last test dates to the free gas station and C-store calendar. It calculates each next due date from the cited rule, sends reminders, and keeps the results for your proof packet.
Sources: 30 TAC §334.50 (release detection) · 30 TAC §334.49 (corrosion protection) · 40 CFR 280.35 (spill and overfill, containment sumps) · 40 CFR 280.40 (release detection equipment). FireMarket does not file or submit records to SFMO, TDI, TCEQ, or the AHJ.
Review the provider's available license, insurance, trade, and service-area evidence before making a selection.
Describe the property, trade, scope, and timing so matched providers can respond with relevant bids.
Keep job records and provider documents together for your own review and follow-up.
Create a free account, post your job, and invite providers to submit comparable quotes.
Get Started Free