HFD LSB 02 §2.4.3.3 requires a test that simulates failure of normal power and transfers the load to the emergency supply on each automatic transfer switch, performed by an approved independent licensed master electrician or licensed electrical service company with written results. LSB 02 does not state an interval; FireMarket schedules it annually with the generator load test, and you can change it.
Find fire safety service providers in Houston, Texas and compare their bids. Ask providers to document work against the applicable LSB 02 §2.4.3.3 / Houston Fire Code §1203.4.4 requirements.
Free to post · No commitment
The transfer-switch test confirms the building moves to emergency power when utility power fails. Houston Fire Code §1203.4.4 puts transfer switches in the same inspection, testing and maintenance schedule as the generator.
Required frequency: LSB 02 §2.4.3.3 sets no interval; FireMarket default is annual, with the §2.4.3.2 generator load test (editable)
An approved independent licensed master electrician or licensed electrical service company (LSB 02 §2.4.3.3). This is an electrical license, not an SFMO/TDI fire-protection license class.
LSB 02 §2.4.3.3 requires the test but does not set an interval. Houston Fire Code §1203.4.4 includes transfer switches in the approved generator schedule, so FireMarket defaults to once a year alongside the annual load test. Your system's approved schedule may call for more.
An approved independent licensed master electrician or licensed electrical service company (LSB 02 §2.4.3.3). This is an electrical license, not an SFMO/TDI fire-protection license class.
FireMarket does not publish a fixed price for this service. Request a quote; price depends on system size and condition, site access, deficiencies found, parts, after-hours work, and the reports or tags required.
Yes. Ask the contractor to price inspection and testing separately from repair or replacement line items, so you can approve corrective work after seeing the findings.
Create a free owner account, post the job, compare bids, and hire on FireMarket. Bidding is capacity-aware, and time-on-site check-in and check-out can document the visit. Booking is not instant.
Add the system and its last test date to your property's compliance calendar. It calculates the next due date from the cited interval, sends reminders, and keeps the report for your proof packet.
Sources: HFD LSB Standard No. 02, Rev. 05 (eff. 01/01/2024) · Houston Fire Code Chapter 12, §1203. FireMarket does not file or submit records to SFMO, TDI, TCEQ, or the AHJ.
Review the provider's available license, insurance, trade, and service-area evidence before making a selection.
Describe the property, trade, scope, and timing so matched providers can respond with relevant bids.
Keep job records and provider documents together for your own review and follow-up.
Create a free account, post your job, and invite providers to submit comparable quotes.
Get Started Free