Houston, Texas

Automatic Transfer Switch Testing in Houston

HFD LSB 02 §2.4.3.3 requires a test that simulates failure of normal power and transfers the load to the emergency supply on each automatic transfer switch, performed by an approved independent licensed master electrician or licensed electrical service company with written results. LSB 02 does not state an interval; FireMarket schedules it annually with the generator load test, and you can change it.

Find fire safety service providers in Houston, Texas and compare their bids. Ask providers to document work against the applicable LSB 02 §2.4.3.3 / Houston Fire Code §1203.4.4 requirements.

Free to post · No commitment

LSB 02 §2.4.3.3 / Houston Fire Code §1203.4.4

Automatic Transfer Switch Testing in Houston

The transfer-switch test confirms the building moves to emergency power when utility power fails. Houston Fire Code §1203.4.4 puts transfer switches in the same inspection, testing and maintenance schedule as the generator.

Required frequency: LSB 02 §2.4.3.3 sets no interval; FireMarket default is annual, with the §2.4.3.2 generator load test (editable)

An approved independent licensed master electrician or licensed electrical service company (LSB 02 §2.4.3.3). This is an electrical license, not an SFMO/TDI fire-protection license class.

Automatic Transfer Switch Testing in Houston: cost, frequency, and booking

How often should an automatic transfer switch be tested in Houston?

LSB 02 §2.4.3.3 requires the test but does not set an interval. Houston Fire Code §1203.4.4 includes transfer switches in the approved generator schedule, so FireMarket defaults to once a year alongside the annual load test. Your system's approved schedule may call for more.

Who can perform the transfer-switch test?

An approved independent licensed master electrician or licensed electrical service company (LSB 02 §2.4.3.3). This is an electrical license, not an SFMO/TDI fire-protection license class.

How much does it cost?

FireMarket does not publish a fixed price for this service. Request a quote; price depends on system size and condition, site access, deficiencies found, parts, after-hours work, and the reports or tags required.

Can I request an inspect-only quote separate from repairs or replacement?

Yes. Ask the contractor to price inspection and testing separately from repair or replacement line items, so you can approve corrective work after seeing the findings.

How does booking work?

Create a free owner account, post the job, compare bids, and hire on FireMarket. Bidding is capacity-aware, and time-on-site check-in and check-out can document the visit. Booking is not instant.

When is my next test due?

Add the system and its last test date to your property's compliance calendar. It calculates the next due date from the cited interval, sends reminders, and keeps the report for your proof packet.

Sources: HFD LSB Standard No. 02, Rev. 05 (eff. 01/01/2024) · Houston Fire Code Chapter 12, §1203. FireMarket does not file or submit records to SFMO, TDI, TCEQ, or the AHJ.

Why property owners in Houston choose FireMarket USA

Credential evidence in context

Review the provider's available license, insurance, trade, and service-area evidence before making a selection.

Request comparable quotes

Describe the property, trade, scope, and timing so matched providers can respond with relevant bids.

Compliance built in

Keep job records and provider documents together for your own review and follow-up.

Ready to find a automatic transfer switch testing contractor in Houston?

Create a free account, post your job, and invite providers to submit comparable quotes.

Get Started Free

Who pays what

  • Posting a job and getting bids is free. No card is needed to post.
  • The property manager pays the accepted bid amount. FireMarket adds no fee on top for the property manager.
  • The contractor pays FireMarket's platform fee, taken out of the payment: at the base tier, 4% when the property manager pays by bank account and 4.5% when they pay by card. Silver (4.5%) and gold (4%) contractor loyalty tiers pay their tier rate, or the bank rate when it is lower.
  • The first 5 paid jobs on each property manager account carry no platform fee.
  • The property manager saves a bank account or card when they award the job. Payment for the job goes through FireMarket.
  • Refunds: within 30 days of payment on a completed job, the property manager can open a dispute with a description (at least 40 characters) and an evidence link. FireMarket reviews it. When a dispute is resolved with a refund, the payment is refunded to the bank account or card it came from, platform fee included.