Failed fire inspection in Houston: a deficiency report to fix

Last updated

The problem

"We failed our fire inspection. The inspector left a deficiency report with a list of items and a date they have to be corrected by, and we can't pass until they are. I need a licensed fire contractor to fix them, I don't know which company to call, and I don't want to spend the week calling around for quotes."

What it looks like once fixed

Every item on the deficiency report is corrected by a contractor licensed for that system, before the correction date, and the building passes re-inspection.

How it gets fixed through FireMarket

  1. Post the repair job in your FireMarket owner account and list each deficiency as written on the report, with the correction due date. If the system was given a yellow or red tag, Post a job from a yellow/red tag pre-fills the job from what is on the tag. Posting is free, with no card needed to post.
  2. Contractors licensed by the Texas State Fire Marshal's Office (SFMO/TDI) for that system bid. Each bid shows the contractor's license class and certificate-of-insurance status, from FireMarket's weekly re-check of SFMO/TDI records. A contractor using AI Auto-Bid in auto mode has the AI create and submit the bid on its own, with no approval step. You can also invite contractors you already use.
  3. With FireMarket's AI award turned on (it is opt-in), when bidding closes the AI ranks the bids on contractor rating, price against your budget, on-time record, distance and cancellation history, and awards the job to the top eligible bid at or above your minimum score. With it off, you pick the bid.
  4. The winning contractor accepts or declines within 24 hours. The job is assigned only when they accept; if they decline, the AI awards the next-best eligible bid, and if none is left, you pick.

Post the repair job free

How long it takes

You set how long bidding stays open, from 1 to 30 days, so pick a window that leaves time to schedule the work before the correction due date on the report. The winning contractor then has 24 hours to accept.